PremiumCrewConstruction · Earthworks
Cut and fill volume (average end area)
Cut, fill and net earthwork between cross-sections using the average end area method.
Unlock this tool
This is a paid tool. Sign in, then unlock it on its own or with a pack.
Included in these packs
Private infrastructure contractingSite preparation and earthworks
What this tool asks forCut areas at each station, Fill areas at each station, Station interval, Fill shrinkage.