Project manager
Float, change orders, pay apps, permits and closeout. 16 tools, 10 of them free.

Free tools
Labor productivity and crew size
Labor hours, duration and crew size for a quantity of work from a unit productivity rate.
Construction · Project controlsChange order pricing (OH&P)
Price a change order from direct costs with overhead, profit, sub markup, tax and bond.
Construction · Project controlsBid markup vs margin
Convert between markup and gross margin and get the bid price from cost.
Construction · EstimatingOSHA incident rates (TRIR, DART)
Total recordable incident rate, DART rate and lost-time rate from cases and hours worked, against an industry benchmark.
Construction · SafetyConcrete pour planner
Truck loads, pour duration, truck spacing and trucks in rotation for a ready-mix pour.
Construction · ConcretePunch-list and closeout readiness
Are you ready for the final walk, inspection and handover? Scores readiness and lists what is still open.
Construction · ResidentialAsphalt paving tonnage
Hot-mix tons, truck loads and tack coat for a paving area and thickness.
Construction · PavingWork zone taper length (MUTCD)
Taper length, channelizer count and spacing, and advance warning sign spacing for a lane closure.
Construction · Traffic controlSilt fence layout and quantity
Rows of silt fence needed on a slope, total length, stakes and rolls, and a drainage-area check.
Construction · Erosion controlPermit and mobilization readiness
Checks the permits, notices and agreements that most often hold up mobilization, with a score and the open items.
Construction · Project controlsPaid tools
Unlock one on its own, or get them together in a pack.
Cut and fill volume (average end area)
Cut, fill and net earthwork between cross-sections using the average end area method.
Construction · EarthworksRent vs own equipment decision
Annual cost of owning a machine versus renting it by the day, week or 4-week month, and the break-even hours.
Construction · Equipment rentalSchedule float and critical path (simple)
For up to three parallel task chains to a milestone: which chain is critical, the float on the others and the slack to the deadline.
Construction · Project controlsPay application and retainage
Current payment due, retainage held and balance to finish, in the AIA G702 layout.
Construction · Project controlsHouse cost per square foot estimate
Early budget for a home from heated area, garage and porch area, finish level, region and site costs.
Construction · ResidentialGravity pipe flow capacity (Manning)
Full-pipe flow and velocity for a gravity storm or sewer pipe, and how full your design flow runs it.
Construction · UtilitiesPacks with these tools